This project consisted of the construction of a new park, including a guardhouse, outfitters building, picnic shelter and restrooms, and a pavilion.
The guardhouse and entry to the park is wood framed with plywood sheathing and turned down concrete slab/foundation. The outfitters building is wood framed with plywood sheathing, gable shaped roof, raised floor system will consist of a wood framed platform bearing on round sonotube formed concrete piers and spread footings. The picnic shelter and restrooms are a raised wood framed platform floor and wood framed ramp, all supported on round sonotube formed concrete piers and spread footings, shed shaped roof framed in wood and supported by structural steel pipe columns cantilevered from the foundation and structural steel pipe beams. The main pavilion includes one small, enclosed building with restrooms, storage, and a bridal suite, and the other is a roofed open air pavilion event space. Wood framed walls sheathed in plywood support the roof of the small, enclosed building. The open-air pavilion consists of a raised wood framed platform floor and ramp, supported on sonotube formed concrete piers and spread footings. The roof will be wood framed for the most part, in the form of cable/rod tied, steel flitch plated rafters, spanning between two lines of structural steel pipe columns cantilevered from the foundation, with double structural steel pipe beams.
This project was completed as 4SE, Inc., prior to joining EM Structural in 2021.
Location: Dorchester County, SC