Concrete floor placement has begun! Check out this link to see a construction camera of our Third and Grand project in Detroit, Michigan:
http://www.ibeamsystems.com/private/thirdgrand/setup/
This project consists of subterranean parking, mild and post tensioned elevated slabs for parking and retail, a post tensioned concrete podium and 5 levels of load bearing light-gauge steel EcoSpan framing in the residential units.
See more on this project here: Third and Grand